Location: Dublin, Ireland
Area: 3 300 sqm.
Architect: Henry J Lyons / Todd Architects
Dublin Airport Authority - Head Office Building project compromises a refurbishment of 45-year-old former Aer Lingus head office with an area over 8000 sqm. The new office block with Grade A specification, a LEED gold certification and an A3 energy rating needed double-glazed façade with improved energy efficiency. Stepped insulated glass units (clear and spandrel) with extra selective triple silver coating SNX50/23 from Guardian and maximum sizes of 1.5х2.8 m with toggle channels were used.
Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics the number of visitors, bounce rate, traffic source, etc. |